
STS-31 Patch
STS-31 Patch
Launch Highlights
The launch was scheduled for April 18, then April 12, then April 10, following the Flight Readiness Review (FRR). The first date set at FRR was earlier than that shown on previous planning schedules. The launch scheduled for April 10 was scrubbed at T-4 minutes due to a faulty valve in auxiliary power unit (APU) number one. The APU was replaced and payload batteries recharged. Countdown briefly halted at T-31 seconds when computer software failed to shut down a fuel valve line on ground support equipment. Engineers ordered valve to shut and countdown continued.
Mission Highlights
The primary payload, Hubble Space Telescope, deployed in a 380-statute-mile orbit. Secondary payloads: IMAX Cargo Bay Camera (ICBC) to document operations outside crew cabin and hand-held IMAX camera for use inside crew cabin; Ascent Particle Monitor (APM) to detect particulate matter in payload bay; Protein Crystal Growth (PCG) to provide data on growing protein crystals in microgravity; Radiation Monitoring Equipment III (RME III) to measure gamma ray levels in crew cabin; Investigations into Polymer Membrane Processing (IPMP) to determine porosity control in microgravity environment; Shuttle Student Involvement Program (SSIP) experiment to study effects of near-weightlessness on electrical arcs, and Air Force Maui Optical Site (AMOS) experiment.
Shipping:
Free shipping (orders over $50) in the United States is shipped via First Class Mail 3-6 business days.*
Priority Mail is available for an extra charge. Delivery 2-6 business days*
Priority Express is also available for an extra charge. Delivery 1-3 business days.
Learn More
In-store Pickup:
We offer in-store & curbside pickup options for JSC Team members with onsite access to JSC.