STS-45 Patch

STS-45 Patch

Sale price$6.95 USD
Quantity:

STS-45 Patch

Launch Highlights

The launch was originally scheduled for March 23, but was delayed one day because of higher than allowable concentrations of liquid hydrogen and liquid oxygen in the orbiter’s aft compartment during tanking operations. During troubleshooting, the leaks could not be reproduced, leading engineers to believe that they were the result of plumbing in the main propulsion system not thermally conditioned to the super cold propellants. Launch was rescheduled for March 24.

Mission Highlights

The mission carried the first Atmospheric Laboratory for Applications and Science (ATLAS-1) on Spacelab pallets mounted in the orbiter’s cargo bay. The non-deployable payload, equipped with 12 instruments from the U.S., France, Germany, Belgium, Switzerland, the Netherlands and Japan, conducted studies in atmospheric chemistry, solar radiation, space plasma physics and ultraviolet astronomy. ATLAS-1 instruments were: Atmospheric Trace Molecule Spectroscopy (ATMOS); Grille Spectrometer; Millimeter Wave Atmospheric Sounder (MAS); Imaging Spectrometric Observatory (ISO); Atmospheric Lyman-Alpha Emissions (ALAE); Atmospheric Emissions Photometric Imager (AEPI); Space Experiments with Particle Accelerators (SEPAC); Active Cavity Radiometer (ACR); Measurement of Solar Constant (SOLCON); Solar Spectrum (SOLSPEC); Solar Ultraviolet Spectral Irradiance Monitor (SUSIM); and Far Ultraviolet Space Telescope (FAUST). Other payloads included Shuttle Solar Backscatter Ultraviolet (SSBUV) experiment, one get-away Special (GAS) experiment and six mid-deck experiments.